Piers checked while the holes are still open and the cages can be seen.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
Rebuild blocks across Castle Hill often slope, and a sloping block usually means piers or stepped footings to reach consistent ground. The commonest problem we meet is timing: concrete already in the holes before anyone has measured them, at which point depth and steel can only be taken on trust.
Annotated findings from Bored piers inspections.




2Slab pre-pourPods, mesh and drainage set out, ahead of the concrete truck
3FrameWalls standing and trusses fixed, before wrap and lining
4Lock-up (pre-plaster)Roof, windows and external doors in, before plaster
5FixingJoinery and doors hung, before painting
6WaterproofingCoating dry and the tiler not yet booked in
7Pre-handover (PCI)About two weeks before you take possessionInstant online pricing, or talk to the booking team on 1300 471 805.
Because once concrete fills them, nobody can confirm how deep they go or where the steel sits. Piers carry the house on difficult ground.
We record it and note what can no longer be verified, which is itself useful if movement shows up later.
No. It depends on the soil report, the slope and the engineer's design for your lot.
Let us know as soon as the drilling date is set. A day's notice usually works.
Your structural engineer, based on the geotechnical report. We check the work against that drawing.
The principal certifier may inspect footings as a critical stage. Our inspection is for you and reports workmanship in more detail.