In short: Waterproofing inspections across the Hills District keep finding missing bond breakers and pinholes in membranes. Both need fixing before the tiler arrives.

What a bond breaker does

It stops a flexible membrane bonding hard into the corner where wall meets floor, so the membrane can stretch as the building moves.

What happens without one

The membrane is held rigid across the joint and tears when the joint moves. Water then gets behind the tiles.

Pinholes

Tiny holes in the cured membrane, often in niches and corners. Each one is a leak path.

Puddle flanges

The membrane must wrap the puddle flange at the floor waste fully, or water tracks around it.

The fix

Bond breakers added, extra coats over pinholes, flanges wrapped. All simple before tiling, all difficult after.

Written by our local inspection team from work carried out in Castle Hill. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More new construction stage inspections guides for Castle Hill

All guides →

Book a building inspection in Castle Hill

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Castle Hill owners ask about this

Which standard covers this?

AS 3740, Waterproofing of domestic wet areas.

Can I see pinholes myself?

Sometimes, with a torch at a low angle.

Is a second coat enough?

Usually, if the coating is applied to the specified thickness.

Does every bathroom need checking?

Yes. Faults are often in one wet area and not the others.